Here are some pictures of the construction of the babies home, one of our 4 buildings. I came right after the slab was poured and now we are about to put the roof on. Exterior walls are dressed stone, interior walls are brick with plaster.
These 5 pictures are of the first nursery school building. John and I started the building layout a month and a half ago, and we are about to pour the slab. The Second nursery school building is nearby and at about the same stage of construction. The masonry will be a job for the next intern.
No comments:
Post a Comment